Prefabrication, assembling and installation of plant is characterized by piping and collector DN 42” sp.52,50mm. and first-pass weld TIG.
Prefabrication, assembly and installation of reduction Gas characterized by piping and collectors DN 48” and DN 6” of various thicknesses for total 25.000”.
Prefabrication, assembling and installation of plant utilities (gas, water, steam, compressed air, fire and chemical / pharmaceutical plants.
Construction bundle tube consists of 4 tubes DN 30” and 2 tubes of DN12” complete with 250.000 kg of carpentry for quality control crossing into microtunnel.
Construction and assembly methane pipeline DN 16 "Power Central ml. 5,200
Construction and assembly methane pipeline DN 14 "connection junction box Siemens for ml. 16.500,00
Construction and assembly of quality carpentry in the site Schiedam of Saipem for preparation CASTORO IV, NORMAND CUTTER BER PROTECTOR.
Prefabrication, assembly and installation of plant Utilities (gas, water, steam, compressed air, fire) and assembly machines for products processing.
Design supply and installation of automated system for storage and distribution of hydrocarbons.
Prefabrication, assembly and installation of sprinkler system with assembly VICTAULIC piping technique.
Prefabrication, assembly and installation of system for heating and cooling, including the treatment stations air UTA , lines and channels.