PROJECTS

Project Terminal Gas – Corrib (Ireland)

Prefabrication, assembling and installation of plant is characterized by piping and collector DN 42” sp.52,50mm. and first-pass weld TIG.


Project reduction Gas plant for group Eni – Ferrara ( IT)

Prefabrication, assembly and installation of reduction Gas characterized by piping and collectors DN 48” and DN 6” of various thicknesses for total 25.000”.

Project for Dopperl Farmaceutici – Cortemaggiore (PC)

Prefabrication, assembling and installation of plant utilities (gas, water, steam, compressed air, fire and chemical / pharmaceutical plants.

Project tube bundle for Praoli s.p.a. - Genoa Pegli ( GE)

Construction bundle tube consists of 4 tubes DN 30” and 2 tubes of DN12” complete with 250.000 kg of carpentry for quality control crossing into microtunnel.

Project Methane Pipeline for Enel s.p.a. – Figline V.no ( AR)

Construction and assembly methane pipeline DN 16 "Power Central ml. 5,200

Methane pipeline for the Ministry of Energy - Tangiers (Morocco)

Construction and assembly methane pipeline DN 14 "connection junction box Siemens for ml. 16.500,00

Project Quality carpentry for Saipem – Schiedam (Holland)

Construction and assembly of quality carpentry in the site Schiedam of Saipem for preparation CASTORO IV, NORMAND CUTTER BER PROTECTOR.

Project for Vetreria of Borgonovo s.p.a. – Borgonovo (PC)

Prefabrication, assembly and installation of plant Utilities (gas, water, steam, compressed air, fire) and assembly machines for products processing.

Project for hydrocarbons for Consorzio Agrario di Cremona – Casalmaggiore (CR)

Design supply and installation of automated system for storage and distribution of hydrocarbons.

Project Sprinkler system in Center Polifunz. Lingotto – Torino

Prefabrication, assembly and installation of sprinkler system with assembly VICTAULIC piping technique.

Project for Center Polif. Bicocca – Sesto San Giovanni

Prefabrication, assembly and installation of system for heating and cooling, including the treatment stations air UTA , lines and channels.

Food plants for Parmalat

Prefabrication, assembly and installation of food plants for transport and processing of milk and its derivatives with its maintenance.

Project of food plants Sterilgarda Alimenti

Prefabrication, assembly and installation of food plants for transport and milk processing and its derivatives with its relative maintains and workforce 20.000 hours in a year.